Replying to
"Boeing to start 737 Max production on new assembly line July 6" by CNBC - New Boeing 737 MAX assembly line at Everett WA (Paine Field #KPAE) will start July 6. The 737 "North Line" is mainly for MAX10 but also some 8/9 (no 7), adding to existing 737 production at Renton which assembles on average 2 planes each weekday. Boeing used vacant space in the Everett factory from the 747 which ended 2023. Everett also makes 767 & 777. https://www.cnbc.com/2026/06/05/boeing-ceo-737-max-production-assembly-line.html #aviation #business #travel #avgeek #PNW
